Packaging & Manufacturing Consulting
Efficiency Capability, Productivity

Categories

Locations

View items per page
Sort by
Item 7121 - Biodiesel Plant 7 MGPY
Manufacturer
Bionerg, S.A.
Model
7 MGY
Capacity
7

Biodiesel plant - NEW, never used except to run test trials and prove biodiesel production. Rated at 7 Million gallon per year. Built 2009. Designed for degummed soybean oil input. Produces 6,470 #/hr of B100 + 847 #/hr of concentrated glycerin. Built and designed by Bionerg (ePlus), S.A. Argentina. Biodiesel train skidded - ready to load. Includes Hurst firetube boiler, unload & load systems, Glycerin system. Set up to meet spec ASTM D6751. Price includes all equipment, control system and control logic. Removal and Loading costs not included. Can probably be run in place.

Place Holder
Item 4534 - Firetube Boiler 200HP
Manufacturer
Johnston
Model
.
Capacity
200

One (1) 2005 200 HP Johnston, 4 pass-wet back, 150 PSI design pressure, with a PowerFlame Burner designed to fire natural gas and No. 2 oil. The boiler will be cleaned on the fireside, waterside, outside, and painted. New fireside and waterside gaskets will be installed. The boiler pressure vessel, tubes, piping, and blowdown valves will be hydrostatically tested. Any components not passing hydro will be repaired or replaced. The existing Honeywell 7800L Flame Safeguard Controls will be checked and replaced if found defective. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit steam pressure controls will be installed. The boiler will be electrically and mechanically checked to identify and replace any defective components. We guarantee that the pressure vessel and tubes are in very good condition, and the boiler will pass a hydrostatic test at the time of startup. 1 year parts replacement warranty on controls. Pictures are not actual boiler but similar Johnston boilers after completion.

Place Holder
Item 8096 - Firetube Boiler 200HP
Manufacturer
Johnston
Model
Capacity
200

One (1) 1998 200 HP Johnston boiler, 4 pass wet back, gas and No. 2 oil fired, 250 PSI design pressure The boiler will be cleaned on the fireside, waterside, outside, and painted. The boiler pressure vessel, tubes, piping, and blowdown valves will be hydrostatically tested. The existing Honeywell 7800L Flame Safeguard Controls will be checked and replaced if found defective. New Honeywell High Limit with manual reset, Operating Limit, and Modulating Limit Controls will be installed. The boiler will be electrically and mechanically checked throughout to identify and replace any defective components. The combustion air fan will be run to check for balance and bearing smoothness. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. We will give a 1 year parts replacement warranty on controls. These photos are representative - boiler is yet to be reconditioned - allow 4 to 6 weeks after order. This quote is for the boiler only. No support equipment is included. Note that this boiler is a litle shorter and wider than standard Johnston dimensions so will not be a direct drop in if replacing with like kind.

Place Holder
Item 7459 - Firetube Boiler 750HP
Manufacturer
Johnston
Model
750HP
Capacity
750

Johnston 750HP Firetube Boiler. Built in 1989. 4 pass wet-back with steam at 150psi. This boiler has an IC burner and runs on gas and #2 and #6 oil. Boiler is in good condition and so are the tubes. Price is " as is " and includes loading the boiler onto your truck. Boiler can be offered " reconditioned ". If interested, please inquire about additional reconditioned price.

Place Holder
Item 5376 - Firetube Boiler 800 HP
Manufacturer
Hurst
Model
.
Capacity
800

Reconditioned 800 HP Hurst Boiler, 4 pass wet back design, built in 2002 and complete with a 2016 PowerFlame Low Nox Burner to fire natural gas and No. 2 fuel oil, meets 30 PPM Nox on natural gas, 150 PSI design pressure. The boiler will be cleaned on the fireside, waterside, outside, and painted. The pressure vessel and tubes, trim piping, and blowdown piping and valves will be hydrostatically tested. The PowerFlame Burner System is equipment with the Siemans LMV-5 Linkageless Control System. (See attached brochure) The boiler and burner components will be electrically and mechanically checked to identify and replace any defective components. New relief valves will be shipped loose for field installation. The boilers will be complete with modulating feedwater level controls. We guarantee that the pressure vessel and tubes are in good condition and that the boiler will pass a hydrostatic test at the time of startup. 1 year parts replacement warranty on the controls. Photos are representative. Shipment: Estimated 6 to 8 weeks after receipt of an order and down payment. Two available, priced separately.

Place Holder